Building a House: Day 139-149

Electrical and HVAC is finished and inspections for that done (and passed!). Fireplace picked out and installed, as well as the furnace (though gas lines won’t be run to our house until after the ground has thawed).

Main living room
Kitchen wiring
Decided to add a small window in our bathroom, where the actual toilet will be
Framing for fireplace
Furnace and duct work
Electrical panel
Duct work framed over
Fireplace installed

Leave a Reply

Your email address will not be published. Required fields are marked *